Get a free quote in The northwest and Buckingham Estates
Key takeaways
- The northwest mixes older homes, row houses, rentals and houses of the 2000s, so each call starts with finding out which era the pipes belong to.
- Wet weather in 2025 pushed bypasses at pumping stations, which makes a sump pit and a backwater valve worth discussing early.
- Buckingham Estates is the newest neighbourhood in listings, and plumbing questions there are best settled before the basement is finished.
Streets and ages
Church, Nelson, Snider Crescent, Francis, Dashwood Road, Alexander West, Sanders West and Wellington West hold about 350 occupied homes. Roughly 22 per cent were built before 1961 and 23 per cent between 2001 and 2010, with the rest spread over the decades between. About 100 are row houses and about 225 households rent. Around Hill and Gregus Court, roughly 42 per cent date from before 1961 and 42 per cent from 1961 to 1980, with nothing built since 1991.
First repairs on row houses and rentals
Shared walls and rented suites make access the first question: where the shut off sits, which unit a stack serves and who lets the plumber in. Homes from 1961 to 1980 often still have their original copper and valves, and an old valve can seize after decades unused. Houses from the 2000s use plastic supply pipe and finished basements, so their calls are faucets, fixtures and water heaters.
Tower, river and wet days
The Exeter Water Tower on Nelson Street got mixing in 2018, partly to keep the tank from freezing. The Snider Crescent pumping station dates from the early 1990s. Snowmelt and heavy rain forced seven bypasses at South Huron pumping stations in 2025, in early March, early April and late December. The Ausable ran high under a footbridge at MacNaughton Park in July 2023, and low areas flooded in April 2025.
The newest streets
Buckingham Estates sits off an extension of Church Street, with Triebner and Greene Streets in the plan. The Municipality lists 119 houses planned, with draft approval in 2016, and listings call it the newest neighbourhood in town. A new house on the sewers is a sensible moment to plan a sump pit and a backwater valve before the basement is finished.
Next door
Close by, Main Street and the town centre is where the oldest blocks stand, with plaster walls, shops and the earliest pipes. Across town, The east end, Windermere and Stoneyridge has streets built mostly since 1961, plus subdivisions that are still filling in near Morrison Line.
Quotes from Church Street outward
Plumbing Exeter quotes jobs from the older blocks to the newest lots, free of charge. The crew opens with a service call and puts the quote on paper first. The job can be as small as a leaking valve or as large as a basement bathroom.
Services for this area
Sump Pumps
Need Sump Pumps in Exeter? Plumbing Exeter handles sump pumps end to end with tested results. Schedule service.
Mainline Backwater Valve Installation
Need Mainline Backwater Valve Installation in Exeter? Plumbing Exeter installs and tests backwater valves for safer drainage. Book today.
Plumbing For New Construction
Need Plumbing For New Construction in Exeter? Plumbing Exeter installs new plumbing systems with tested results. Request an appointment.
Water Heater Repair
Need Water Heater Repair in Exeter? Plumbing Exeter repairs gas and electric heaters and verifies safe operation. Schedule a repair.
FAQ